How to Specify IO Requirements Part II

Whenever we chat about IO and storage there are actually FOUR factors to determine requirements. Often people only discuss the first one (Capacity) so we have to tease out the others:

1. Capacity

2. Throughput

3. Latency

4. Service Levels

1. Capacity

Capacity is the easy one that no one misses. How many GB do I need ?

The obvious mistakes we see people making is to only size for the raw data. You also need to size for:

2. Throughout

Throughput is how fast do I need the IO to be or rate of transfer. This is typically measures in IOP’s which is the windows perfmon counter “Logical Disk\Disk Transfers per Sec” or it can also be measured in MB/Sec.

Usually, we measure how many 64k random read/write IO’s we need per second at the correct latency (8-20ms) for data files.

An exception to this is sometimes when designing data warehouses, we speak in terms of MB/Sec. The reasoning here is that a lot of research has gone into Microsoft’s “Fast Track” design for data warehouses that estimate a single CPU can consume about 200 MB/Sec sequential reads. While a full blown “fast Track” design might be too expensive for most Irish pockets, the underlying principles and estimator calculations are still really useful for sizing.

http://www.microsoft.com/sqlserver/2008/en/us/fasttrack.aspx

3. Latency

This is how responsive do I need the disks to be and is measured by the perfmon counter “Logical Disk\Avg Secs per Transfer”. SQL Server is very prescriptive here:

The exception to this is data warehouses where we accept higher latency (8-50ms). The reasoning is very simple – if a query is going to take 30 seconds to scan millions of rows then having to wait 50ms to get started isn’t going to loose anyone any sleep …

3. Service Levels

This is how resilient do we need the storage to be:

As an example, imagine if you have a 24×7 SQL Server on RAID 5 and a disk blows and will take eight hours to rebuild. What if the IOPS drops from 1,000 to 500 during the rebuild and latency goes from 8ms to 60ms? This could mean that this event is technically an outage for eight hours. if a disk blows a few times a year you will have lots of outages. Therefore the requirements should state “we need 1,000 IOPS and 8ms latency DURING a disk failure event”, or “We can accept 800 IOPS and 10ms latency during a disk failure event”. This will help the storage designer make the correct choice on configuration. For example he may use 15 spindles on RAID 5 rather than 8 to ensure requirements are met, or he may change from RAID 5 to RAID 6. If you don’t specify the requirements, you can’t really blame the storage designer or Vendor for not meeting them!!

For a real mission critical SQL Server, i would run the “SQLIO” test during these conditions to baselines expectations and check requirements met.

Bottom line is Service Levels is the stick that you use to get the storage designer to over spec the IO requirements from the basic requirements  😉 It will raise the cost of course.